Recovery of a sum of Rs. 111/2/- being the excess pay drawn by the dismissed Sub-overseer Babu N.C. Nag attached to the office of the Chief Engineer, Dacca Division.
Recovery of a sum of Rs. 111/2/- being the excess pay drawn by the dismissed Sub-overseer Babu N.C. Nag attached to the office of the Chief Engineer, Dacca Division.
File No. 1A-2/43
- 1943
- 19 P; H-35 cm; W-22 cm
সচিবালয় রেকর্ডরুম সংগ্রহ (প্রথম পর্যায়)
Chief --Engineer
সচিবালয় রেকর্ডরুম সংগ্রহ (প্রথম পর্যায়)
Chief --Engineer